Overview
Enviro Drainage Services completed maintenance desludging of the Westwood Place R8 wetland in north-west Melbourne ahead of its planned handover to Melbourne Water. The wetland pond held a significant build-up of sediment, organic material and construction debris reaching approximately 1,100mm in depth, and the works had to hold up against persistent rain and soft ground at the drying area. Using vacuum trucks, a six-inch water pump and a skid steer, the team removed approximately 150,000kg of wet sediment and debris over 10 working days.
The Challenge
- Heavy sediment and debris build-up of up to approximately 1.1 metres.
- Persistent rain repeatedly reintroduced water to the pond during the works.
- Soft ground at the temporary drying and tipping area constrained material handling.
Our Solution
- Installed pipe plugs where applicable to isolate inflows and support controlled, staged dewatering.
- Used vacuum trucks and a six-inch water pump to remove water and saturated sediment in stages, with a skid steer managing material within the basin and drying area.
- Transferred dried material to tandem trucks for transport to an approved off-site disposal facility, then completed a final clean-down and inspection of the pond.
Result
The nominated debris and sediment were removed within the 10-day working window despite ongoing rain and soft-ground conditions, leaving the wetland pond cleaned and ready to progress through the planned Melbourne Water handover process.